Yokogawa HFL2-S6

316LSS

Open Market / 45 Days

Yokogawa HFL4-05B

1/2" - 300 RF

Open Market / 45 Days

Yokogawa HFL4-05C

1/2" - 600 RF

Open Market / 45 Days

Yokogawa R-V500-C2GS

Gate 1/2" NPT SS

Open Market / 45 Days

Yokogawa R-V500-C2NC

Needle 1/2" NPT CS

Open Market / 45 Days

Yokogawa HTH2-S4

304LSS - Reduces Pressure rating 50%

Open Market / 45 Days

Yokogawa HTH2-TC

Temperature Compensated System (Available for DP Systems only)

Open Market / 45 Days

Yokogawa HFL4-20C

2.0" - 600 RF

Open Market / 45 Days

Yokogawa HTH2-TF

PTFE (o-ring) 350 F Max

Open Market / 45 Days

Yokogawa EJX310B-2

With Rc1/2 female process connector

Open Market / 45 Days

Yokogawa EJX310B-4

With 1/2NPT female process connector

Open Market / 45 Days

Yokogawa EJX310B-A

2.5 to 500 psia

Open Market / 45 Days

Yokogawa HTH4-C

Single 1/2" NPTF

Open Market / 45 Days

Yokogawa EJX930A-H

20 to 2,000 inH2O

Open Market / 45 Days

Yokogawa 1W-10068709-1111

VisiTrace Optical DO 120 mm VP for low ppb ranges (standalone 4-20 mA 2-wire...

Open Market / 45 Days

Yokogawa EJX930A-K

316 SST or SCS14A 2-inch pipe mounting (L type)

Open Market / 45 Days

Yokogawa 1W-2040007

7.2 AH Battery

Open Market / 45 Days

Yokogawa 1W-237135

OXYGOLD G MEMBRANE KIT (KIT OF 3)(No electrolyte is included)

Open Market / 45 Days

Yokogawa DY080-BA2

ANSI 300 Flange type (Raised Face)

Open Market / 45 Days

Yokogawa AXF025C-L2

Calibration Certificate, Level 2 Declaration and Calibration Equipment List

Open Market / 45 Days

Yokogawa M1289DC

2.0 Inch 150# flange adapter in PVDF (For -*G sensor), Requires O-ring Kit...

Open Market / 45 Days

Yokogawa M1289DS

3.0 Inch 150# flange adapter in SS (For -*G sensor), Requires O-ring Kit...

Open Market / 45 Days

Yokogawa M1289JX

2.5 Inch 150# flange adapter in SS (For -*G sensor), Requires O-ring Kit...

Open Market / 45 Days

Yokogawa AXF080W-BA2

ANSI Class 300 Flange (Stainless Steel) Material: JIS SUS304 or SUSF304 (AISI...

Open Market / 45 Days

Yokogawa AXF080W-CA2

ANSI Class 300 Flange (Carbon Steel) Material: JIS SS400 or SFVC 2A

Open Market / 45 Days

Yokogawa M1289LP

1 1/2 inch Tri-Clamp, 316ss (for -SB sensor)(Replaces K1542FF)

Open Market / 45 Days

Yokogawa AXF080W-L2

Calibration Certificate,Level 2 Declaration and Calibration Equipment List

Open Market / 45 Days

Yokogawa EJX930A-7

1/2 NPT female, two electrical connections with a blind plug

Open Market / 45 Days

Yokogawa EJX930A-C2

Output signal limits: 3.8 mA to 20.5 mA Output status at CPU failure and...

Open Market / 45 Days

Yokogawa AXF300G-C2

NAMUR NE43 Output limits:3.8 to 20.5 mA Output status at CPU failure/hardware...

Open Market / 45 Days

Yokogawa AXF300G-CA2

ANSI Class 300 Flange (Carbon Steel) Material: JIS SS400 or SFVC 2A

Open Market / 45 Days

Yokogawa DY080-HX2

Anti-Corrosion Version 1-2

Open Market / 45 Days

Yokogawa DY080-KN2

ATEX Type n Approval

Open Market / 45 Days

Yokogawa EJX930A-D4

M calibration (kgf/cm2 unit)

Open Market / 45 Days

Yokogawa HFR-P14S6

Single 1/2" NPT Flush Port Plug 316SS

Open Market / 45 Days

Yokogawa EJXC40A-T51

Pressure test/leak test certificate Test pressure:2 MPa (290 psi)

Open Market / 45 Days

Yokogawa HFR-4

Dual 1/2" NPTF

Open Market / 45 Days

Yokogawa AXF300C-2

With Indicator (Vertical)

Open Market / 45 Days

Yokogawa FBR-2

Two 1/4-inch Flushing Connections (316 SST Lower Housing)

Open Market / 45 Days

Yokogawa EJX610A-SU2

IECEx Intrinsically safe, Type n, and Flameproof Approval (For Output Code -D,...

Open Market / 45 Days

Yokogawa EJX630A-5

G1/2 female, two electrical connections and a blind plug

Open Market / 45 Days

Yokogawa EJX630A-C1

Output status at CPU failure and hardware error is -5%, 3.2 mA or less.

Open Market / 45 Days

Yokogawa HTH2-P22HC

Dual 1/4" NPT Flush Port Plug Alloy C-27

Open Market / 45 Days

Yokogawa HTH2-P22S6

Dual 1/4" NPT Flush Port Plug 316SS

Open Market / 45 Days

Yokogawa EJX630A-C2

Output signal limits: 3.8 mA to 20.5 mA Output status at CPU failure and...

Open Market / 45 Days

Yokogawa EJX630A-D4

M calibration (kgf/cm2 unit)

Open Market / 45 Days

Yokogawa HTH2-P24HC

Dual 1/2" NPT Flush Port Plug Alloy C-276

Open Market / 45 Days

Yokogawa RCU310K-JB

IOa, PLp, PLp, IOa 2 active current output HART 2 passive pulse output or...

Open Market / 45 Days

Yokogawa DY300-KS2

ATEX Intrinsically Safe Approval Ex ia IIC T4 to T2 (Integral) Ex ia IIC T6 to...

Open Market / 45 Days

Yokogawa AXF050C-2

With Indicator (Vertical)

Open Market / 45 Days